| Location: | Swimming pool building Tuzla, Constanta |
| Quantity: | 400 m2 |
| Initial status: | Light building, wooden frames and OSB |
| Executed works: | Thermoinsulation with polyurethane foam – thickness 150 mm |
| Location: | Costinesti |
| Quantity: | 280 m2 |
| Initial status: | New built attic |
| Executed works: | Thermoinsulation – poliuretanic foam |
| Observations: | Work execution: 8 hours (including surface preparation) |
| Location: | Constanta |
| Quantity: | 50 m2 |
| Initial status: | Covered with waterproofing membrane |
| Executed works: | Unmounting existing waterproofing, foam and Polyurea application |
| Observations: | Very narrow application area |
Continue Reading →
| Location: | Cumpana Village |
| Quantity: | 120 m2 |
| Initial status: | New building |
| Executed works: | Polyurethane foam and Polyurea application |
| Observations: | Windy area |
Continue Reading →
| Location: | BCR Bucharest |
| Quantity: | 90 m2 |
| Initial status: | Concrete covered with several layers of different membranes |
| Executed works: |
Unmounting existing waterproofing, application of cement membrane on old concrete, application of Polyurea over cement membrane |
| Observations: | Double labour and permanent water present (the air conditioning could not be stopped) |
Continue Reading →
| Location: | BCR |
| Quantity: | 55 m2 |
| Initial status: | Concrete covered with several layers of different membranes |
| Executed works: | Unmounting existing waterproofing, application of cement membrane on old concrete, application of Polyurea over cement membrane |
| Observations: | Double labour due to application of two completely different products |
Continue Reading →
| Location: | BCR – Bucharest |
| Quantity: | 65 m2 |
| Initial status: | Old panels, old wood, covered with carton |
| Executed works: | Carton unmounting, Foam and Polyurea application (thermo-hydro system) |
| Observations: | Difficult application due to terrace irregularities |
Continue Reading →
| Location: | Constanta |
| Quantity: | 70 m2 |
| Initial status: | New mounted panel |
| Executed works: | Polyurea application |
| Observations: | Very difficult access due to mounted equipment |